The shower unit and toilet facility was bespoke new and purpose built for the project. It is still one of the largest single units we have built and it weighs in at an impressive 15 tonnes.
The main structural frame was a hot rolled steel of fully welded construction, offering an extended lifespan compared to that of a timber frame. The externals are clad in plastisol panels and trimmed to reflect brand colours. This unit is very durable and long lasting.
Let’s Discuss Your Project Today